Gully Guard – Taylor Wimpey

01

Client

Bell Contracing Ltd working as appointed groundwork contractors for Taylor Wimpey on their new Parc Celyn development in Green Meadows, Cwmbran.

02

Project Detail

Having heard of Forest Group’s Gully Guard product through a Taylor Wimpey health and safety forum, production director Tim Davies was intrigued by its potential benefits. Consequently, he decided to conduct a trial of the Gully Guard product at the Trevenson Meadows construction site. Tim believed that implementing this product could enhance safety measures and operational efficiency on site. The decision to test the product stemmed from a commitment to maintaining high safety standards and seeking innovative solutions for common construction challenges.

03

Application

The area of build was originally farm land with deep topsoil, resulting in extremely muddy conditions during the construction process. In situations such as this there is potentially a high risk of contamination if silt run-off is not actively managed and controlled. If companies don’t take adequate precautions to prevent this happening, they face prosecution and large fines if the contamination is severe.

The usual method of filtering gullies is to line them with a membrane backfilled with straw, enabling water to pass through but capturing larger particles. Deposits of silt build up quickly, clogging the gully grates which have to be cleared by ground workers on a frequent basis, which is time consuming and messy.

 

“I admit I was sceptical at first, fully expecting the challenging conditions at the site to be more than a match for the product. However I’m extremely pleased with the results. There has been no clogging of gullies and no detectable contamination. This is a more technical solution than the usual outdated method and has met with approval from the Environment Agency who are equally impressed with the product.”

Tim is confident that using Gully Guard has saved both time and money.

“There are definitely quantifiable benefits, particularly in reducing the necessity for ground workers to clear the gullies on a frequent basis. On this site, I estimate that using Gully Guard has reduced this need by up to 8 times.”

“At Taylor Wimpey we take our environmental responsibilities very seriously. In this instance, dealing with excessive silt was the immediate problem, but we know that Gully Guard has also achieved excellent scientific test results in terms of how it copes with a wide range of other pollutants, including hydrocarbons, heavy metals and other chemicals.

 

“I would have no hesitation in recommending our continuing use of Gully Guard for our filtration needs. Put quite simply – it works.”

– Tim Davies

04

Conclusion

The successful trial of Forest Group’s Gully Guard product at the Trevenson Meadows construction site underscores its significant advantages for Taylor Wimpey plc. By effectively preventing gully clogging and eliminating contamination risks, Gully Guard has proven to be a superior alternative to traditional methods. The product not only reduces the time and labor required for maintenance but also ensures compliance with environmental regulations, earning the approval of the Environment Agency. Tim Davies’ endorsement highlights the tangible benefits of Gully Guard, emphasizing its role in enhancing operational efficiency and environmental responsibility. The integration of Gully Guard into Taylor Wimpey’s projects exemplifies the company’s commitment to innovative, effective, and sustainable construction practices.

Forest Group UK Logo Decoration